Crunch time..

I have been working on Ross's 29R this week and should have it done mid next week. It is another single speed with the new rocker drop outs. It has a rigid fork, stem and stainless post. He opted for the 2 bolt stem to keep the clean lines of the front clamp. Tomorrow I should finish the stem and get the frame tacked.

This time of year kind of takes its toll on me. The bike shop is slow, the weather kind of stinks and I am always feeling like a chicken with its head cut off. We will probably be working til the bitter end assembling bikes getting ready for the show. Ed is driving a 2 ton van down to Austin which should provide some more blog entries!

Here is a random shot of Ross's fork after welding:

Fork welds

Cheers,
Drew